دوره 5، شماره 3 - ( 7-1400 )                   جلد 5 شماره 3 صفحات 193-185 | برگشت به فهرست نسخه ها


XML Print


Download citation:
BibTeX | RIS | EndNote | Medlars | ProCite | Reference Manager | RefWorks
Send citation to:

Jafari M, Tofighi S, Sadeghifar J, Ghasemyani S, Roshani M, Toulideh Z. Stakeholder Participation in the Strategic Plan Developing Process: A Survey from the Hospital Setting. EBHPME 2021; 5 (3) :185-193
URL: http://jebhpme.ssu.ac.ir/article-1-336-fa.html
Stakeholder Participation in the Strategic Plan Developing Process: A Survey from the Hospital Setting. 1. 1400; 5 (3) :185-193

URL: http://jebhpme.ssu.ac.ir/article-1-336-fa.html


چکیده:   (1348 مشاهده)
Background: One of the most important requirements for developing a strategic plan is the effective participation of various stakeholders in plan formulation. The aim of present study was the evaluation of stakeholder participation in the strategic plan developing process in selected hospitals in Tehran.
Methods: This is a cross-sectional study. This study was conducted in selected hospitals at Tehran in 2015. The data collection tool was a researcher made questionnaire consisting of 3 parts: demographic data, stakeholder participation, and attention to the strategic plan's components. The validity of questionnaire was confirmed by experts, and its reliability was confirmed by Cronbach's Alpha test (α = 0.8). The SPSS18 software was used for data analysis. Descriptive statistics (means, standard deviations, and percentages) were calculated.
Results: The findings showed that the highest (42.9) and lowest (34.7) mean score of stakeholder participation in the strategic planning formulation was related to "provision required information for planning" and" presentation of gathering and documentation of the plan, "respectively. Hospital managers (91 percent) had the highest involvement, and external stakeholders had the least participation (1.7 percent) in the strategic planning formulation. The least attention is devoted to evaluating the proposed strategies' feasibility, identifying competitive and strategic differentiation, and identifying stakeholders' concerns and needs, respectively.
Conclusion: Stakeholders' involvement in the formulation of the hospitals' strategic plan was not favorable, and hospitals were unable or unwilling to benefit from their participation in the program.
     
نوع مطالعه: پژوهشي |
دریافت: 1399/11/20 | پذیرش: 1400/7/12 | انتشار: 1400/7/12

ارسال نظر درباره این مقاله : نام کاربری یا پست الکترونیک شما:
CAPTCHA

بازنشر اطلاعات
Creative Commons License این مقاله تحت شرایط Creative Commons Attribution-NonCommercial 4.0 International License قابل بازنشر است.

کلیه حقوق این وب سایت متعلق به مدیریت، اقتصاد و سیاستگذاری سلامت مبتنی بر شواهد می باشد.

طراحی و برنامه نویسی : یکتاوب افزار شرق

© 2017  All Rights Reserved | Evidence Based Health Policy, Management and Economics

Designed & Developed by : Yektaweb